{"id":1272,"date":"2025-12-20T11:19:23","date_gmt":"2025-12-20T11:19:23","guid":{"rendered":"https:\/\/cndlfh.com\/?p=1272"},"modified":"2025-12-20T11:19:23","modified_gmt":"2025-12-20T11:19:23","slug":"%e9%92%88%e5%af%b9%e5%a4%a7%e5%9e%8b%e9%92%a2%e7%bb%93%e6%9e%84%e5%b7%a5%e7%a8%8b%e7%9a%84%e5%ae%9a%e5%88%b6%e5%8c%96%e9%93%86%e7%84%8a%e5%8a%a0%e5%b7%a5%e8%a7%a3%e5%86%b3%e6%96%b9%e6%a1%88","status":"publish","type":"post","link":"https:\/\/cndlfh.com\/en\/1272\/","title":{"rendered":"Customised riveting and welding solutions for large-scale structural steelwork."},"content":{"rendered":"<p>Large steel riveting, customised<a href=\"https:\/\/cndlfh.com\/en\/?p=1272&amp;preview=true\">rivet welding<\/a>Solutions, Engineering Welding Services<\/p>\n<p>Article Outline:<\/p>\n<p>Introduction: To present the challenges faced by large-scale structural steel projects (e.g. bridges, power stations, stadiums, high-rise buildings): oversized components, complex nodes, on-site work, and stringent standards.<\/p>\n<p>Analysis of the unique challenges of riveting large steel structures:<\/p>\n<p>Size and weight present lifting and positioning challenges.<\/p>\n<p>Deformation and residual stress control in thick plate welding.<\/p>\n<p>Environmental (wind, rain, height) impacts of on-site construction.<\/p>\n<p>Comply with mandatory requirements of building industry standards (e.g. AWS D1.1).<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1273\" src=\"https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201838.png\" alt=\"\" width=\"708\" height=\"561\" srcset=\"https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201838.png 708w, https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201838-15x12.png 15w\" sizes=\"auto, (max-width: 708px) 100vw, 708px\" \/><\/p>\n<p>Our four-part series of customised solutions:<\/p>\n<p>Stage 1: Joint simulation of design and process: Simulation of welding distortion using Finite Element Analysis (FEA) to optimise the welding sequence and process.<\/p>\n<p>Stage 2: Workshop prefabrication and modularisation: Precision welding of sub-units is completed in a controlled workshop environment where possible, reducing the amount of work on site.<\/p>\n<p>Stage 3: Hybrid Joining Techniques with High Strength Bolts and Welding: Explain when to use welding and when to use high strength bolts and the advantages of combining the two.<img loading=\"lazy\" decoding=\"async\" class=\"alignnone size-full wp-image-1202\" src=\"https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201752.png\" alt=\"\" width=\"438\" height=\"557\" srcset=\"https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201752.png 438w, https:\/\/cndlfh.com\/wp-content\/uploads\/2025\/12\/QQ20251002-201752-9x12.png 9w\" sizes=\"auto, (max-width: 438px) 100vw, 438px\" \/><\/p>\n<p>Stage 4: On-site Welding Management and Quality Control: A team of licensed welders is dispatched with mobile equipment to implement a strict on-site QA\/QC programme.<\/p>\n<p>Successful Case Study (illustrated): A detailed description of a specific bridge or construction project, describing the problems encountered and how our solution worked.<\/p>\n<p>Safety and Project Management: Emphasis is placed on our management systems for site safety and project scheduling.<\/p>\n<p>Conclusion: Co-operation with experienced and professional partners is the key to the success of large-scale steel construction projects.<\/p>\n<p>Call to Action: Large engineering contractors and turnkey contractors are welcome to contact us for an initial process plan and quote for your project drawings.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u5927\u578b\u94a2\u7ed3\u6784\u94c6\u710a\uff0c\u5b9a\u5236\u5316\u94c6\u710a\u89e3\u51b3\u65b9\u6848\uff0c\u5de5\u7a0b\u710a\u63a5\u670d\u52a1 \u6587\u7ae0\u5927\u7eb2\uff1a \u5f15\u8a00\uff1a \u63d0\u51fa\u5927\u578b\u94a2\u7ed3\u6784\u9879\u76ee\uff08\u5982\u6865\u6881\u3001\u7535\u7ad9\u3001\u4f53\u80b2\u573a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[25],"tags":[],"class_list":["post-1272","post","type-post","status-publish","format-standard","hentry","category-25"],"_links":{"self":[{"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/posts\/1272","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/comments?post=1272"}],"version-history":[{"count":1,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/posts\/1272\/revisions"}],"predecessor-version":[{"id":1274,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/posts\/1272\/revisions\/1274"}],"wp:attachment":[{"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/media?parent=1272"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/categories?post=1272"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/cndlfh.com\/en\/wp-json\/wp\/v2\/tags?post=1272"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}