How to participate in scrap metal treatment tender? Process and precautions full analysis

How to participate in scrap metal treatment tender? Process and precautions full analysis

I. Access to bidding information: authoritative channels and timeliness control

Scrap metal disposal projects are often initiated by state-owned enterprises, or municipal sanitation units, or large manufacturing enterprises, or environmental protection industrial parks, and the bidding information must be published in the public resources trading platform at the provincial level or above in accordance with the law. According to the “Regulations on the Implementation of the Government Procurement Law” and "Electronic Tendering Measures", all projects that reach the limit standard, that is, more than 2 million yuan of goods, must be entered into the China Tendering and Bidding Public Service Platform, or provincial and municipal public resources trading centre website for public release. In practice, about 73% of the scrap metal disposal projects use the "open bidding" method, while the rest are procured through competitive negotiation or single-source procurement (Source: Ministry of Ecology and Environment Solid Waste Management Annual Report 2023). Pay close attention to the details of the subject matter in the announcement (such as the classification and estimated tonnage of copper, aluminium and iron and steel scrap), the qualification requirements for disposal (you must have a Hazardous Waste Operation License or Recycling Record Registration), and the percentage of performance bond (usually between 2% and 5% of the contract amount). Don't use information pushed by intermediaries other than the official ones to prevent missing the crucial time points, the period of bidding documents on sale can't be less than five working days, and the deadline for bidding is not less than twenty natural days from the time of the announcement.

图片[1]-如何参与废旧金属处理招标?流程与注意事项全解析-大连富泓机械有限公司

Second, the qualification and ability to prepare: hard threshold and practical proof is indispensable

If you are participating in a tender for the treatment of scrap metal, the basic qualifications are a prerequisite for entry. Bidders, you have to meet these three types of legal conditions at the same time: First, the business licence of the business scope to clearly cover the “recycling and sales of renewable resources,” “scrap metal processing” or “solid waste management. Second, must hold the ecological environment department issued in the validity of the ”hazardous waste business licence", if it involves oil-containing scrap steel, waste circuit boards and other hazardous wastes of HW49 class; Third, have to match the scale of the disposal of the warehousing site, the warehousing site is either owned, or the lease contract has to be full more than 1 year, and there should be a list of sorting equipment and tax records for the last 12 months. According to the research done by China Material Recycling Association in 2024, more than 68% of the aborted bidding cases were due to the fact that the bidders didn't provide the complete EIA acceptance approval documents or didn't provide the proof of access to the GPS monitoring system of the transport vehicles. Special attention should be paid to the fact that some local governments require bidders to have a resident service team in the local area and provide proof of social security payment; for cross-province operation enterprises, they also need to submit the Record Certificate of Recycling Resources Recycling Operators (Ministry of Commerce Decree 2022 No. 1) and the commitment letter for off-site operation at the same time.

III. Preparation of bidding documents: accurate alignment of technical programmes and commercial responses

图片[2]-如何参与废旧金属处理招标?流程与注意事项全解析-大连富泓机械有限公司

The documents prepared for bidding must strictly respond to the “substantive provisions” of the bidding documents, and any deviation from them is likely to result in the bidding documents being judged to be invalid. On the technical part, to find three key to focus on, one of them, is the classification of the disposal process interpretation, for example, if it involves waste aluminium smelting, then it must be clear that the furnace temperature control range in degrees Celsius six hundred and sixty to seven hundred and fifty this interval, and flue gas purification device specific types, the recommended is the bag plus activated carbon adsorption of such a combination of forms; the second is the environmental protection compliance to give the protection of relevant initiatives, which covers the wastewater, the water, the water, the water, the water, the water, the water, the water, the water, the water, the water, the water and the water. The second is the environmental compliance to ensure the relevant initiatives, which covers the design programme to achieve zero discharge of wastewater, drawing the layout of the noise monitoring points, and hazardous waste storage room impermeability coefficient should be greater than or equal to ten negative ten centimetres per second test report; the third is the emergency response plan, which must contain the leakage, fire and other scenarios such as handling procedures, and the local ecological and environmental protection bureau of the linkage mechanism. The commercial part focuses on verifying the composition of the offer, which includes labour costs, transport costs, processing loss rate, the industry average of 3.2%-5.8%, and the time limit for the issuance of VAT invoices, which is usually required to be within 30 days.2023 Bid evaluation data for the dismantling project of scrap motors in a province shows that the offer is lower than the average market price of more than 15% In the bidding documents, 821 TP3T was found to be “unreasonably low” because of the failure to provide a cost analysis sheet.

IV. Compliance and regulation: highlights of the whole process of compliance from winning the bid to closing the loop

After winning the bid, to sign a written contract within 30 days, during this period, but also synchronised to complete the three statutory actions, one of which should be submitted to the bidder performance bond, this bond issued by the bank, the amount is not less than the contract price of 10%, and the second to the local business sector to update the recycling of renewable resources recycling information for the record, and the third to enter the transport vehicle information into the National Solid Waste Management Information System. Disposal process to implement the “one thing, one code” traceability management methods, each batch of scrap metal must be uploaded to the electronic joint list, this joint list contains the weight, composition test report, go to the unit to receive the receipt of the data will be real-time docking Ministry of Ecology and Environment solid waste management platform. It should be noted that in 2024, the implementation of the newly revised "Management Measures for Recycling of Renewable Resources" clearly requires that for projects with a single disposal volume of more than 50 tonnes, a third-party agency must be commissioned to carry out an assessment of the efficiency of resource utilisation and the assessment report needs to be reported within 15 working days after the completion of the disposal. If the report is not submitted in accordance with the deadline or there is data falsification, it will be included in the national credit blacklist of the recycling industry, which will affect the qualification of all government procurement bids in the following three years.

© copyright statement
THE END
If you like it, support it.
kudos8 share (joys, benefits, privileges etc) with others
Recommended
commentaries sofa-buying

Please log in to post a comment

    No comments