arrange in order
Methods for controlling verticality in the construction of high-rise steel structures?
II. Installation Process: Phased “Dynamic Adjustment” The installation of high-rise steel structures is typically carried out floor by floor in “segments” (each column section being 8–12 m in height), with verticality controlled through dynamic monitoring and real-time adjustments as installation progresses. 1


