Technical programmeTotal 2 articles
钢梁拼装预拱度调节装置的制作方法-大连富泓机械有限公司

Production method of steel girder assembling pre-arch degree adjustment device

1.The utility model relates to the technical field of bridge construction, specifically a steel girder assembling pre-arch degree adjustment device. BACKGROUND TECHNOLOGY: 2. With the rapid development of the construction market, the construction of highways, high-speed railways and other projects has also ushered in a new peak of development.
hfc87的头像-大连富泓机械有限公司hfc8723 days ago
07715
船舶结构的修改方法与流程-大连富泓机械有限公司

Methods and processes for modification of ship structures

The present invention relates to ships, and in particular relates to a method of modifying the structure of a ship. BACKGROUND TECHNOLOGY: 1. The hull structure needs to be modified during the construction of a ship, and it is common to divide a modification area in the hull and remove the original structure in the modification area
hfc87的头像-大连富泓机械有限公司hfc872 months ago
08513