Technical programmeTotal 4 articles
船舶结构的修改方法与流程-大连富泓机械有限公司

Methods and processes for modification of ship structures

The present invention relates to ships, and in particular relates to a method of modifying the structure of a ship. BACKGROUND TECHNOLOGY: 1. The hull structure needs to be modified during the construction of a ship, and it is common to divide a modification area in the hull and remove the original structure in the modification area
hfc87的头像-大连富泓机械有限公司hfc875 months ago
09813
钢梁拼装预拱度调节装置的制作方法-大连富泓机械有限公司

Production method of steel girder assembling pre-arch degree adjustment device

1.The utility model relates to the technical field of bridge construction, specifically a steel girder assembling pre-arch degree adjustment device. BACKGROUND TECHNOLOGY: 2. With the rapid development of the construction market, the construction of highways, high-speed railways and other projects has also ushered in a new peak of development.
hfc87的头像-大连富泓机械有限公司hfc873 months ago
010715
微小零件产品复合加工方法与流程-大连富泓机械有限公司

Methods and processes for the composite machining of small components

The present invention relates to a composite machining method for micro-components and falls within the field of mechanical processing technology. Background: Micro-components are characterised by their small size, thin walls, thin sheets and micro-holes.
hfc87的头像-大连富泓机械有限公司hfc871 month ago
06814
一种桥式起重机滑触线快速安装装置及安装方法与流程-大连富泓机械有限公司

A Quick-Installation Device for Bridge Crane Sliding Contact Lines, and the Installation Method and Procedure Therefor

1. The present invention relates to the field of lifting equipment installation, and more specifically to a rapid installation device and method for the conductor rail of a bridge crane. Background: 2. A bridge crane is a type of crane in which the girder runs on elevated rails; it is also known as an overhead crane. 3
hfc87的头像-大连富泓机械有限公司hfc87the day before yesterday
03511