Hull ConstructionTotal 3 articles
【干货知识】船体结构焊接顺序-大连富泓机械有限公司

[Practical Tips] Welding Sequence for Ship Hull Structures

3.3 If the end of a fillet weld is located on the closure edge of a section, a length of approximately 200 mm should be left unwelded at that section for the time being; this section should be welded only upon closure, as shown in Figure 4(c). b) After tack welding the longitudinal girders, web plates and inner bottom plate flat assemblies
hfc87的头像-大连富泓机械有限公司hfc8738 days ago
01189
【干货知识】船体结构焊接顺序-大连富泓机械有限公司

[Practical Tips] Welding Sequence for Ship Hull Structures

3.3 If the end of a fillet weld is located on the closure edge of a section, a length of approximately 200 mm should be left unwelded at that section for the time being; this section should be welded only upon closure, as shown in Figure 4(c). b) After tack welding the longitudinal girders, web plates and inner bottom plate flat assemblies
hfc87的头像-大连富泓机械有限公司hfc871 month ago
0617
【干货知识】船体结构焊接顺序-大连富泓机械有限公司

[Practical Tips] Welding Sequence for Ship Hull Structures

3.3 If the end of a fillet weld is located on the closure edge of a section, a length of approximately 200 mm should be left unwelded at that section for the time being; this section should be welded only upon closure, as shown in Figure 4(c). b) After tack welding the longitudinal girders, web plates and inner bottom plate flat assemblies
hfc87的头像-大连富泓机械有限公司hfc871 month ago
06914