arrange in order
Production method of steel girder assembling pre-arch degree adjustment device
1.The utility model relates to the technical field of bridge construction, specifically a steel girder assembling pre-arch degree adjustment device. BACKGROUND TECHNOLOGY: 2. With the rapid development of the construction market, the construction of highways, high-speed railways and other projects has also ushered in a new peak of development.
Technology|Correction of welding deformation and control of steel structure
本书主要讲述如何控制焊接变形。内容包括焊接变形的规律和梁、柱焊接弯曲变形的计算,焊接板结构箱形梁腹板预拱度计算,减小焊接变形的方法
Riveting machine selection method revealed, on-demand selection efficiency doubled!
Modern industrial development is growing, more and more enterprises began to focus on production efficiency and product quality. Riveting machine as a riveting special equipment, in modern production occupies a fairly important role, but this equipment can not be randomly selected!
Quick-open pressure vessel practical examination simulation question bank (new version).docx
Quick-opening Pressure Vessel Practical Examination Mock Questions (New Version).docx,PAGE 1 Pressure Vessel Operations - Quick-opening Pressure Vessel (Item Code R1) Practical Examination Mock Questions Table of Contents TOC o 1-
Structural differences between I-beams and H-beams and their applications
011.Differences between I-beams and H-beams 1.1 Differences in Structural Characteristics In practice, the differences between I-beams and H-beams often confuse construction practitioners. Although the two steels are similar in appearance
Repair method of deformation of main beam of overhead travelling crane
The main girder structure of overhead travelling crane will be deformed by various factors in the process of long-term application, and the deformation problem can not be completely avoided, for the deformation of the main girder structure.
Analysis and Improvement of the Reasons for Cracking the Upper End of the Bucket Bar of Excavators
Excavator bucket rod upper end cracking reason analysis and improvement,1.Cracking phenomenon of a model of excavator factory work 3000h or so, one after another, the upper end of the bucket rod cracking phenomenon, cracking part is located in the top of the bucket rod reinforcing plate and the bucket rod cylinder piston rod support plate articulation overlap weld at the vertical plate.
Causes of welding deformation and control methods
Manufacturing is the foundation of national strength, please pay attention to “metal processing” (mw1950pub).
Discussion on the control strategy of steel structure welding deformation and defects
Welding deformation control methods are diverse and can be applied flexibly in different situations. Due to the complexity of the welding process and the ever-changing morphology of steel structures, the search for efficient control methods has always been the focus of research in the field of structural steel welding.
Vibrating screen side plate cracking don't be afraid, a few simple steps easy to fix! (With specific processing steps)
Vibrating screen side plate cracking is not to be afraid of, a few simple steps can be easily fixed! (With specific processing steps) Vibrating screen is easy to appear after a long period of operation, such as cross beams, track beams and other fracture and side plate cracks and other problems, cross beams and track beams can be solved by replacing, and the side plate out of the